PLEASE NOTE: Delays in processing orders. Orders placed between Thursday 30 July  and Monday 10 August will be processed 11 August.

Cable - Parts

A generic image

Cable parts : nipples and ferrules.

Displaying 9 to 16 (of 38 Products)
Model Product Image Product Name Qty. Price
M-CO2 (image for) Cable oiler, pro

Cable oiler, pro

Pro Cable oiler, lubricator. Colours may vary.
2
$12.40
Add:
C-5007 (image for) Cable, ferrule, cable end cover cap, 1/4 inch

Cable, ferrule, cable end cover cap, 1/4 inch

Throttle cable ferrule end cap, 1/4 inch (6.35mm) OD nose diameter, nose length 7/16 inch (11.7mm). Suits B5 casing...
0
$0.75
... more info
M-CF1 (image for) Cable, ferrule, cable end cover cap, 5.5mm (7/32 inch)

Cable, ferrule, cable end cover cap, 5.5mm (7/32 inch)

Throttle cable ferrule end cap, 5.5mm (7/32 inch) suit throttle and oil pump cables
20
$0.50
Add:
M-CF2 (image for) Cable, ferrule, cable end cover cap, 5.5mm (7/32 inch)

Cable, ferrule, cable end cover cap, 5.5mm (7/32 inch)

Clutch cable ferrule end cap, 7mm
20
$0.58
Add:
M-CF4 (image for) Cable, ferrule, cable end cover cap, 6mm

Cable, ferrule, cable end cover cap, 6mm

Throttle cable ferrule end cap, 6mm)
20
$0.50
Add:
C-5003 (image for) Cable, ferrule, cable end cover cap, 7/32 inch

Cable, ferrule, cable end cover cap, 7/32 inch

Throttle cable ferrule end cap, 7/32 inch (5.56mm) OD nose diameter, nose length 7/16 inch (11.2mm). Suits B3 casing...
0
$0.65
... more info
MA-O687 (image for) Cable, ferrule, throttle insert

Cable, ferrule, throttle insert

Throttle cable ferrule for cable end into Doherty type throttle. Made in England.  Only required if you use a...
9
$4.20
Add:
BT-CP14-1+Rclip (image for) Clevis pin, 1/4in dia 1in long with clip

Clevis pin, 1/4in dia 1in long with clip

Clevis pin with R clip , 1/4in diameter x 1in long (7/8inch inside pin hole, Effective Length) with wire R clip.
13
$1.80
Add:
Displaying 9 to 16 (of 38 Products)

PLEASE NOTE: Delays in processing orders. Orders placed between Thursday 30 July  and Monday 10 August will be processed 11 August.